Cellar wall
A job we had started some time back was the cellar. We’d built the separating wall together, and Brian had fitted the ceiling, put some lights in, and made the door.
Our Workaway Chris had helped us dig out the old chaux from the back wall, and Brian and I had regrouted it. But before he’d had the chance to paint on the waterproof plaster, I’d got poorly, so things went on hold.
When our friends came over late last year to help support Brian, and finish off some jobs for us, this was one of them that was on the list.
He’d already bought the product he’d wanted to use, so one morning him and Trevor set to work painting on the plaster. I think it looks great, and it’s made such a difference to the humidity.
We’ll have to see how it performs through the summer, but fingers crossed they made a difference. However, Brian would like to add a second coat, and he found another small water ingress, so it’s an ongoing job.