Scorcher
It’s been a scorcher of a week, temperatures reaching 38°C. The water pump, to get water up the slope, was delivered and fitted this week, so finally we were able to get the pool opened. Just need to wait for the chemicals to settle, then we will be able to use it.
We do need to do a few jobs before we take a day out at the pool. I need to clean the pool room and weed around the pool. Brian wants to clean up the stone work. He started by pushing a loose tile back into place.
Another use for the cleaning pole - tile reposition