‘I have a plan’

Day two, addressing the coving.

One of the most challenging jobs in the room is rebuilding the coving. At some point in time the coving over the windows has become damaged and been replaced with lots of plaster, and last year Brian had to remove a chunk of it as it was loose. Today he had to decide how much more needed to come down, and how much he could save.

Over the months he has been thinking long and hard as to how to approach it, and today he needed to put his plan into action.

After he had removed the coving that could not be saved, he cleaned up the hole that was left, and screwed into place two batons to help secure some strips of plasterboard.

He screwed the pieces into place, then plastered over any gaps. This will all be sanded back once it’s dried. He now needs to replace the moulding.

For that he has another plan.

Previous
Previous

Perfect spot

Next
Next

Dust